渡场[dù chǎng]
{军} crossing site
1. crossing site:crossingpointXingPt过境点;跨越点;渡口XingPt | crossingsite渡场 | crowfootorcrow'sfoot铁蒺藜
1. 依据压铸模具浇口计算的基本原理,给出了内浇口截面积和内浇口内金属液流动速度的计算公式。利用传热学理论,在假定的平板铸件上,推导了型腔填充时间计算式,这些算式是压铸过程的流动模拟与温渡场模拟的重要理论依据,并初步分析了确定内浇口截面积的主要影响因素
In this paper, the principles of gate calculation in the die-casting mould are discussed, and the calculation formulas of gate area adn fiow velocity of metal in the gate are given.
2. 不久前,该团在某生疏水域担负为机动部队开辟河上通道任务,官兵紧跟机动部队遂行保障,历时10昼夜,行程数千公里,连续开设、撤收、转移浮桥渡场,确保机动部队按时完成任务,全面检验了部队在复杂地域遂行渡河工程保障的能力。
Upon receiving the order, the officers and men of the regiment followed closely behind the troops on mobility for 10 days and nights, covering a total distance of several thousand kilometers, during which it set up, removed and transported the float bridges and ferry points timely to ensure the maneuver of the troops.
3. 渡场
3. 昨天下午15时30分,该旅接到命令后,迅速与部分炮兵、防空兵、装甲兵、防化兵和民兵预备役人员,在长江下游某水域进行浮桥门桥渡场构筑、道路机动工程保障、合成部队渡江行动等实战课目的演练。
At 15:30, September 25, after receiving the order of holding the exercise, the brigade immediately joined the troops from the artillery, air defense, armored, anti-chemical units and militiamen as well as reservists to start the exercise involving some real combat subjects such as building the pontoon bridge ferry, mobile road engineering support and complex troops river crossing and so on.
4. 在此基础上,对渡场信息系统进行了系统规划和数据流程分析,并研究了渡场车辆调度模型。
Based on this, the thesis makes a plan for the crossing site information system and analyzes the data process of the system.
5. 然后,针对渡场信息系统中车辆调控问题展开讨论,建立了基于排队论的渡场车辆调控模型,并进行了实例分析。
Then, the thesis fully discusses the subject of vehicle control in the crossing site information system, and builds a vehicle control model of the crossing site based on queuing theory. A case study is also introduced in this thesis.
6. 渡场在线翻译
6. 陆域部分主要根据重力式码头总平面布置原则确定泊位吞吐量、汽车和旅客待渡场等面积,水域部分则是确定航道设计尺度,码头前停泊水域尺度和回旋水域尺度。
According to principle of gravity type wharf general layout, to determine berth throughput, the area of the cars and passengers waiting to across the water. The waters part is to determine channel design scale, the scales of marina waters before berthing and cyclotron waters.