五强溪水电站

五强溪水电站

五强溪水电站

词典五强溪水电站

网络w

五强溪水电站 双语例句

1. 五强溪水电站是什么意思

1. 以五强溪水电站左岸船闸边坡为例,介绍系统的特点和程序的功能。
    This paper takes the ship lock slope of Wuqiangxi Hydropower Station a...

2. 本文以五强溪水电站左岸船闸边坡为例,介绍了系统的设计和程序功能。
    In this paper, taking the shiplock slope of Wuqiangxi Hydropower Station as an example, a programming of the system and functions of program are described.

3. 在这方面的文件,各种方法用于分析和预测边坡变形的讨论,并在船闸边坡五强溪水电站事实,即他们采取行动,作为基地的判决工程设计,也作了介绍。
    In this paper, various methods used for analyses and predictions of slope deformations are discussed, and in the shiplock slope of Wuqiangxi Hydroelectric Power Station the fact that they acted as a base for judgement of the engineering design, are also introduced.

4. 五强溪水电站的解释

4. 目前,除国家正在建设的120万千瓦的五强溪水电站外,已建成小水电499处,总装机容量28万千瓦,居全省第一位。
    At present, in addition to the country is building the 120 MW hydropower station Wuqiangxi, the 499 small hydropower stations have been built, with a total installed capacity of 280, 000 kilowatts, ranking the province first.

5. 研制成功的防渗补强新材料建工Ⅰ、Ⅱ号,成果于1997年通过江苏省建委组织的鉴定,并已在国内湖南五强溪水电站等许多大型水利水电工程修补中得到推广应用。
    Has been qualified by Jiangsu Province Construction Committee and has been widely applied in the remedial work of many larger water conservancy and hydropower station such as Wuqiangxi hydropower station in HunanProvince.

6. 五强溪水电站船闸左岸边坡,是由前震旦系的Pt1和Pt2组成。
    The shiplock slope at left bank of Wuqiangxi Hydroelectric Power Station consists of the pre-Sinian Pt1 and Pt2.

7. 针对五强溪水电站道路改造工程路面混凝土施工实践,阐述了混凝土真空脱水施工准备、施工工艺及施工质量管理和安全措施,以完善该施工工艺,从而提高路面的质量。
    Aiming at pavement concrete construction experience in road transformation project in Wuqiangxi hydroelectric station, it represents concrete vacuum dehydration construction preparation, technology, quality management and safety measures, which will perfect this technology and improve the pavement quality.

8. 全国商务英语等级认证考试培训师和考官,长沙民政职业技术院应用外语系涉外事务管理教研室主任,英语教指委精品课程《文秘英语》课程负责人。1993年7月大学毕业分配至中国水电八局国际部,负责涉外工程的投标工作,先后在湖南省五强溪水电站、四川省二滩水电站C-01标意大利Impregilo公司、深圳赤湾胜宝旺工程有限公司从事翻译、文秘工作,于1999-2002年前往巴基斯坦国任中国东方电气集团公司Ghazi-Barotha水电站 C-03标总秘。
    Associate Professor. NBECT Examinant. She worked as a secretary and interpreter for Wuqiangxi Hydropower Project, Impregilo Construction Co. Ltd. and Shenzhen Chiwan Sembawang Engineering Co. Ltd. after graduation in 1993. From May 1999 to June 2002 she served as Chief Secretary in Dongfang Electric Corporation, the Contractor engaged in the execution of Works under WAPDA Contract C-03: Power Complex of World Bank financed Ghazi-Barotha Hydropower Project for the Federal Government of Pakistan.

9. 五强溪水电站石英岩人工砂石骨料加工厂是我国最大的人工骨料加工系统。
    Wuqiangxi quartzite aggregate processing plant is the largest aggregate processing system in china.

10. 五强溪水电站的近义词

10. 五强溪水电站高水头船闸输水系统动水压力与反向弧门流激振动
    Hydrodynamic pressure acting on wall of filling emptying system and flow induced vibration of reversed tainter gate for high lift ship lock

以上为单词解释
学习应用类查询